Projects

Novkhani Recreation Center Project

A complete MEP package covering approximately 3,500 m² was implemented at the Novkhani Recreation Center, including integrated mechanical and plumbing solutions. The cooling infrastructure is based on an Italian Clivet chiller, while Sabiana Italy fan coil units are used for room-level cooling, heating and temperature control. The heating plant incorporates Arı Kazan boilers manufactured in Turkey, combined with Giersch Germany burners to provide the required combustion solution for the boiler system. DAB Italy circulation pumps are used throughout the heating and cooling circuits to maintain the required water flow and stable hydraulic circulation. The project brings the chiller, fan coil, boiler, burner and circulation-pump equipment together within a coordinated mechanical infrastructure. This integrated MEP approach supports efficient operation of the cooling, heating and plumbing systems across the different areas of the recreation center. The combination of Clivet, Sabiana, Arı Kazan, Giersch and DAB equipment demonstrates a comprehensive engineering solution for modern hospitality and recreational facilities where reliable HVAC and mechanical infrastructure are essential.